1. Price, Estimates & Variations

1.1. Unless an estimate has been provided and accepted by the Customer, all Works will be charged based on FINELINE BUILDING SERVICES LTD’s standard rates at the time of service.
1.2. Estimates are valid for 30 days unless stated otherwise.
1.3. All estimates are fixed price unless:

  • New information requires a price adjustment.
  • Material, equipment, or transport costs have increased before the work starts.
    1.4. If an estimate needs revision, the Customer will be notified before work begins. If the Customer does not agree, the Contract can be cancelled.
    1.5. Additional Work & Variations: Any additional work requested or required beyond the original estimate will be charged at the applicable rate. No additional work will be carried out without prior agreement from the Customer.
    1.6. If a fixed-price estimate is provided but additional hidden defects are found during work (e.g., structural damage, hidden leaks, or faulty wiring), the Customer will be advised, and a revised estimate will be provided before proceeding.

2. Commencement & Completion

2.1. Any dates provided for work commencement and completion are estimates only.
2.2. FINELINE BUILDING SERVICES LTD will make reasonable efforts to attend on the agreed date but accepts no liability for delays.
2.3. The Customer is responsible for providing access to the site at agreed times. If access is not granted, delays may occur, and the Customer may be liable for additional costs.
2.4. Disruptions & Site Conditions: FINELINE BUILDING SERVICES LTD is not liable for delays due to unforeseen site conditions, third-party delays, or additional work required beyond the agreed scope.

3. Inspection & Defects

3.1. The Customer must inspect the completed Works immediately and report any defects in writing within 14 days.
3.2. If no issues are reported within 14 days, the Works are presumed complete and free of defects.
3.3. Any defects that arise within three months due to FINELINE BUILDING SERVICES LTD’s workmanship will be repaired at no additional cost, provided the invoice has been paid in full.
3.4. If FINELINE BUILDING SERVICES LTD inspects a defect and finds it is not due to its workmanship, a call-out fee will apply.
3.5. Exclusions:

  • Materials are covered only by the manufacturer’s warranty.
  • Defects caused by misuse, third-party interference, or pre-existing conditions are not covered.
  • Any modifications, repairs, or alterations made by the Customer or another contractor after work completion will void any guarantees.

4. Cancellations & Rescheduling

4.1. Cancellation fees apply as follows:

  • £50+VAT per engineer if cancelled less than 24 hours before the appointment.
  • £70+VAT per engineer if cancelled 4 hours or less before the appointment.
  • If cancelled 2 hours or less before, the full quoted amount or a 30% abortion fee (whichever is higher) will be charged.
    4.2. If the Customer cancels after authorising work, they will be liable for the cost of materials and time spent.
    4.3. If a Customer cancels a contract after work has commenced, FINELINE BUILDING SERVICES LTD is entitled to recover full payment for work completed and any costs incurred.

5. Force Majeure

5.1. If work cannot be completed due to events beyond FINELINE BUILDING SERVICES LTD’s control (e.g., strikes, extreme weather, supply shortages), the company will not be liable for delays or cancellations.
5.2. If force majeure circumstances prevent work from continuing, FINELINE BUILDING SERVICES LTD reserves the right to invoice for any work already completed.

6. Payment Terms

6.1. Invoices are payable within 0/7/14/30 days from the issue date as stated in the invoice.
6.2. Late Payment Charges:

  • Interest at 8% above the Bank of England base rate, calculated daily from the due date.
  • Fixed Late Fees:
    • £40 for invoices up to £999
    • £70 for invoices between £1,000 – £9,999
    • £100 for invoices over £10,000
  • £10 per reminder for admin fees.
  • 6.3. Unpaid invoices will be passed to our Debt Collectors for immediate collection. Recovery costs will be charged to the Customer.
    6.4. All goods remain the property of FINELINE BUILDING SERVICES LTD until full payment is received.
    6.5. Labour warranties are valid only after full payment.
    6.6. If payment is not made within the agreed timeframe, FINELINE BUILDING SERVICES LTD reserves the right to suspend ongoing work or refuse further services until full payment is received.

7. Liability & Indemnity

7.1. FINELINE BUILDING SERVICES LTD is not liable for:

  • Loss of business, revenue, or profits due to delays or incomplete work.
  • Damage to property not caused directly by FINELINE BUILDING SERVICES LTD’s negligence.
  • Any work carried out by third-party contractors not authorised by FINELINE BUILDING SERVICES LTD.

7.2. The Customer agrees to indemnify FINELINE BUILDING SERVICES LTD against any claims arising from the Customer’s failure to comply with their responsibilities (e.g., providing correct information, ensuring safe site conditions).

8. Snagging & Retention

8.1. If snagging is required:

  • 90% of the outstanding balance must be paid upon completion.
  • The remaining 10% must be paid within 14 days, or the full balance will be due.
    8.2. If access for snagging is denied for 14 days, the remaining balance will become payable.

9. Third-Party Responsibility

9.1. If a third party (e.g., managing agent, tenant, contractor) represents the Customer, they will be liable for payment if the Customer fails to pay, unless agreed otherwise in writing.

10. Health & Safety

10.1. The Customer must ensure the work area is safe and accessible. Any hazards (e.g., asbestos, unstable structures) must be disclosed before work begins.
10.2. If unsafe conditions prevent work from continuing, FINELINE BUILDING SERVICES LTD reserves the right to charge for the time and materials used up to that point.
10.3. If additional safety measures are required (e.g., scaffolding, permits), the costs will be passed to the Customer.

11. Customer Obligations

11.1. The Customer must:

  • Provide accurate information regarding the scope of work.
  • Ensure the site is ready for work and free from obstructions.
  • Obtain any necessary permissions or permits before work starts.
  • Pay all invoices on time.

12. Dispute Resolution

12.1. If a dispute arises, both parties will attempt to resolve it amicably.
12.2. If a resolution cannot be reached, the matter will be referred to an independent arbitrator before legal proceedings.

13. Contact Information

For any queries regarding these terms:

info@finelinebuildingservices.co.uk

By accepting a quotation or proceeding with the service, the Customer acknowledges and agrees to these Terms & Conditions.